Commercial Projects


Adobe Corporate Campus in Utah

General Contractor: Okland Construction
Completed: 2012
Materials Used: Southam and Associates installed the Dri-Design fabricated wall panel system utilizing VM Zinc Quartz Grey materials.


The Ritz Carlton at Northstar Highlands

Location: Lake Tahoe, California
General Contractor: Swinterton / Q and D (joint venture)
Completed: 2010
Materials Used: This two year project saw Southam and Associates installed Englert Low Gloss Kynar sheet metal roofing and wall cladding along with Berger Snow Gems and numerous areas of internal copper gutters and round down spouts.


South Lake Tahoe Vacation Owner Resort

Location: California
General Contractor: R.L. Brown
Completed: 2014
Materials Used: Southam and Associates completed this extremely challenging and detailed 3 year long project in fine fashion cladding the roofing, soffit, fascias and more with Englert Low Gloss sheet metal. Our team also completed the stainless steel deck pans and wall flashings.


Colorado School of Mines / Elm Hall

Location: Golden, Colorado
General Contractor: Kiewit Construction
Completed: 2014
Materials Used: Southam and Associates completed this aluminum composite installation using an amazing ACM system fabricated and engineered by uNeeKe Inc.


Schluter Systems Corporate Training Center

Location: Reno, Nevada
General Contractor: Miles Construction
Completed: 2011
Materials Used: Southam and Associates completed the aluminum composite installation and solar panel installation. ACM panel system designed and engineered by uNeeKe Inc.of Heber City, Utah. Solar wall efficient heat transfer system by SolarWall.


University of Nevada-Reno

Building : Davidson Math and Science Center
General Contractor: The Penta Building Group
Completed: 2011
Materials Used: Southam and Associates completed this massive structure by installing Rheinzink Blue-Grey, Firestone anodized aluminum and post coated aluminum beam and column wraps. This building has a 96’ radius long barrel along the 176’ long East elevation. Special detailing is present for the interior wall panels at the student lounge and stair towers respectively.


The Nevada Museum of Art

Location: Reno, Nevada
General Contractor: Clark and Sullivan
Completed: 2008
Materials Used: Southam and Associates broke all barriers with this project installation using VM ZInc’s Anthra wall panels. This project was listed in VM Zinc’s annual publication as one of the world’s premiere projects. Upon completion, this project also won national recognition from the U.S. architectural community.


Great Basin Brewing Company

Location: Reno, Nevada
General Contractor: Miles Construction
Completed: 2010
Materials Used: Southam and Associated installed the vertical 24 ga. Bonderized grey 7/8” corrugated wall and roofing panels and the horizontal galvanized aluminum 7.2 box rib panels for one of south Reno’s hottest destination s for food and festivities.


Salt Lake Community College

General Contractor:Big D
Completed: 2013
Materials Used:Southam and Associates installed VM Zinc’s 1.0 mm pigmento green material expertly fabricated by Dri-Design into their Dimension Series Panels.


University of Utah

Building: Beverly Taylor Sorenson Art Center
General Contractor:Okland Construction
Completed: 2013
Materials Used: Southam and Associates shop fabricated all of the VM Zinc Quartz Grey material in this project which installed to a beautiful completion.


The Huntsman Cancer Center Parking Structure

General Contractor:Okland Construction
Completed: 2011
Materials Used: Southam and Associates completed our expert installation of this 2” mechanically fastened standing seam metal roofing, soffit and fascia project using Drexel Metals 22 gauge champagne metallic materials.


Private Residence in Utah

General Contractor:Okland Construction
Completed: 2013
Materials Used: Southam and Associates completed the demolition of existing building materials and rejuvenated this beautiful home with the installation of the face mounted ACM panel system by uNeeKe Inc.


BMW of Pleasant Grove, Utah

General Contractor:Culp Construction
Completed: 2006
Materials Used: Southam and Associates completed this very technical aluminum composite panel installation with Armetco Panels.


The RTC 4th Street

Location: Reno, Nevada
General Contractor:West Coast Contractors
Completed: 2010
Materials Used: Southam and Associates installed the compound radius ACM panels on both the North and the South buildings on site. Of note, the exterior panels of the North building actually carry their joint lines through the exterior wall into the lobby soffits details reducing in size to virtually a zero reveal.


Larry H. Miller Lexus

Location: Murray, Utah
General Contractor:Big D
Completed: 2013
Materials Used: Southam and Associates once again teamed up with uNeeKe Inc. to complete this excellent ACM project for one of our areas most predominant automotive deal corporations. The tapered upper façade accentuates the detailing of the Lexus Corporate Model.


University of Nevada-Reno

Building: Medical Learning Laboratory
Location: Reno, Nevada
General Contractor:Sundt Construction
Completed: 2011
Materials Used: Southam and Associates installed not only the architecturally smooth insulated wall panels by Kingspan but also the perforated aluminum screen walls and stainless steel sunshades by Cambridge Architectural.